PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the North Elevation UCIA Roof 5.jpg Installing wood blocking along the high roof parapet Facing West.jpg Erecting the stone panels at the North Elevation UCIA Roof 3.jpg Installing motorized dampers at the 2nd floor Facing North.jpg Installing sprinkler piping at the 2nd floor Facing South.jpg Installing storm at the High Roof Facing East.jpg Interior Electrical roughing at the 2nd floor Facing North.jpg Stated installing sheathing at the low roof Facing West.jpg Duct work at the 4th floor Facing East.jpg
Previous pageNext page Installing sprinkler piping at the 2nd floor Facing South
Installing sprinkler piping at the 2nd floor Facing South